|
Research Groups
|
Participants
|
Grid Scheduling Architecture
|
CNR-ISTI, TUD, FHG, FZJ, UNIDO, UPC, UNICAL, PSNC
|
Reservation-based Scheduling
|
CNRS, ZIB, VUA
|
Examination of Economic-Based Scheduling Mechanisms
|
CNR-ISTI, FHG, FZJ, UNIDO, PSNC, CNRS
|
Integration of the eNANOS execution environment with the
GRMS Resource Broker
|
UPC, PSNC
|
Integration of the advanced reservations mechanism
between the GRMS and eNANOS Brokers |
UPC, PSNC |
Negotiation and Interaction of Scheduler in GRMS
|
UNIDO, PSNC, VUA
|
Grid Scheduling Ontology
|
FhG SCAI, FZJ, UoM
|
Integration of ISS into the VIOLA/MetaScheduling
Environment
|
HES-SO/EPFL, FhG SCAI, FZJ |
Workflow Scheduling with P-GRADE and KOALA |
SZTAKI, TUD, UMUE |
Review of Workflow Description Languages for Grid
Scheduling
|
UNIDO, FHG |
Automatic mapping of applications |
CNR-ISTI, CNRS |
Job co-allocation |
CNRS, TUD |
Scheduling of high performance parallel applications |
ISTI-CNR, DI-UNIPI, UNIDO, CNRS |
Study of performance models and contracts for a class of
Grid application |
ISTI-CNR, DI-UNIPI, UNIDO, VUA |
Collaboration for a Grid Evaluation and Benchmarking
System
|
TUD, UNIDO |
Standard Grid Workload Format |
UOW, UPC, PSNC |
Performance prediction using the Gamma model |
EPFL, PSNC, UPC, UOW, WCNS |
Application of the GPRES performance prediction system
to analysis of real LoadLeveler workloads
|
PSNC, UPC, WCNS |
Handling performance prediction errors in Grid
Scheduling
|
ISTI-CNR, PSNC, WCNS |
Validation of the ISS Multi-level Scheduling System |
CETIC, HES-SO, EPFL, INRIA |
|
|
Last Updated ( Monday, 04 December 2006 )
|
|
|